National League Rugby Discussion Forum Homepage
Forum Home Forum Home > League Rugby - www.leaguerugby.co.uk > The Championship
  New Posts New Posts RSS Feed - Minor/Major improvement works version 2
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

IMPORTANT Remember to read the rules of the board and abide by them when posting.

Minor/Major improvement works version 2

 Post Reply Post Reply Page  <123
Author
Message
Wigwam View Drop Down
World Cup Winner
World Cup Winner
Avatar

Joined: 23 Feb 2012
Location: The sunny south
Status: Online
Points: 1166
Post Options Post Options   Thanks (0) Thanks(0)   Quote Wigwam Quote  Post ReplyReply Direct Link To This Post Posted: 31 Oct 2024 at 11:45
Having witnessed my nipper suffer three nasty injuries whilst playing on this stuff I have to say I hate it. 
It should be used for drill training only. 

Pace Power Perfection
Back to Top
Bedford Bear View Drop Down
British and Irish Lion
British and Irish Lion
Avatar

Joined: 04 Jun 2007
Location: Johannesburg
Status: Offline
Points: 257
Post Options Post Options   Thanks (0) Thanks(0)   Quote Bedford Bear Quote  Post ReplyReply Direct Link To This Post Posted: 02 Nov 2024 at 06:31
Originally posted by Paul10 Paul10 wrote:

I expect not putting a roof on it is "easier" from a planning perspective.

Still, good on em for getting it done.

It's also easier without a roof for licensing purposes as it doesn't require SGSA Safety certification, whereas a covered stand with accommodation for 500 or more seats must be regulated.
Back to Top
gerg_861 View Drop Down
World Cup Winner
World Cup Winner
Avatar

Joined: 11 Jun 2017
Location: Ealing
Status: Online
Points: 2694
Post Options Post Options   Thanks (0) Thanks(0)   Quote gerg_861 Quote  Post ReplyReply Direct Link To This Post Posted: 02 Nov 2024 at 08:59
Originally posted by Bedford Bear Bedford Bear wrote:

Originally posted by Paul10 Paul10 wrote:

I expect not putting a roof on it is "easier" from a planning perspective.

Still, good on em for getting it done.

It's also easier without a roof for licensing purposes as it doesn't require SGSA Safety certification, whereas a covered stand with accommodation for 500 or more seats must be regulated.

Interesting that you would mention this certification. I was involved in a timed evacuation audit of the 1000 seat covered East Stand at TFSC a couple weeks ago. I wonder if it was part of that process.
Back to Top
Bedford Bear View Drop Down
British and Irish Lion
British and Irish Lion
Avatar

Joined: 04 Jun 2007
Location: Johannesburg
Status: Offline
Points: 257
Post Options Post Options   Thanks (0) Thanks(0)   Quote Bedford Bear Quote  Post ReplyReply Direct Link To This Post Posted: 02 Nov 2024 at 11:44
Originally posted by gerg_861 gerg_861 wrote:

Originally posted by Bedford Bear Bedford Bear wrote:

Originally posted by Paul10 Paul10 wrote:

I expect not putting a roof on it is "easier" from a planning perspective.

Still, good on em for getting it done.

It's also easier without a roof for licensing purposes as it doesn't require SGSA Safety certification, whereas a covered stand with accommodation for 500 or more seats must be regulated.

Interesting that you would mention this certification. I was involved in a timed evacuation audit of the 1000 seat covered East Stand at TFSC a couple weeks ago. I wonder if it was part of that process.

Just coincidental, I was recalling safety certification I was connected with, probably 15 years ago when involved with safety capacities.



Edited by Bedford Bear - 02 Nov 2024 at 11:45
Back to Top
 Post Reply Post Reply Page  <123
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.04
Copyright ©2001-2021 Web Wiz Ltd.